User's Manual
S-TAG Datasheet(ST-GR29)
REV 1.0
Solu-M
14/23
3 Operation Test
Equipments : ESL Tag, Gateway, R/C
Figure 6 Operation Test
Test Scenario
① Ready to Gateway and R/C
② Wake up Tag with R/C
③ Tag start to communicate with Gateway
④ Tag display the numeric information received from Gateway
⑤ Check Tag(EPD display status & MAC address value)
⑥ Wake up Tag with R/C
⑦ Check Tag(EPD display(blank display))
Criterion (Below both two conditions should be all satisfied)
① Good : You can see ‘Black’ → ‘White’ display
② Compare MAC address with that of label attached to Front or Back plane.










