User's Manual
S-TAG Datasheet(ST-GR1600N)
REV 1.0
Solu-M
14/23
3 Operation Test
Equipments : ESL Tag, Gateway, R/C
Figure 6 Operation Test
Test Scenario
①
Ready to Gateway and R/C
②
Wake up Tag with R/C
③
Tag start to communicate with Gateway
④
Tag display the numeric information received from Gateway
⑤
Check Tag(EPD display status & MAC address value)
⑥
Wake up Tag with R/C
⑦
Check Tag(EPD display(blank display))
Criterion (Below both two conditions should be all satisfied)
①
Good : You can see ‘Black’
→
‘White’ display
②
Compare MAC address with that of label attached to Front or Back plane.










