Instruction Manual
23 UM0039_Ai-LB 5k_EN_V01_0223
5. Installation For Parallel Use
5.1 System Cable Connection Diagram
Fig. 5.1.1 Multi-Sets Connection (Example:3 Parallel,15kWh,Output Power 7.5kW)
(Battery ∆V should be less than 3V at first Parallel installation )
5.2 Battery Fixation and Front Panel Removal
5.2.1 Fix the battery refer to 4.2.1 to 4.2.3.
5.2.2 Take down battery front panel refer to 5.2.1.
5.2.3 Turn the switch to “OFF” to turn off the internal battery refer to 5.2.2.
Fig.5.2.1 Take down battery front panel Fig5.2.2 Turn off the internal battery