Instruction Manual
17 UM0039_Ai-LB 5k_EN_V01_0223
4.2.2 Installing Backplane
a) Remove the ②backplane and ③expansion bolts(M6x80) from the packing box.
b) Use an impact electric drill to drill holes on the cement floor, and the drilling depth is between 80mm and
85mm.
c) Tighten the expansion bolt slightly and put it vertically into the hole. Knock the expansion bolt with a rubber
hammer until all the expansion pipes enter Into the hole.
d) Pre -tighten the expansion bolt.
e) Screw out the bolts and remove the spring washer and flat washer.
f) Fix the ②backplane on the wall with expansion screws
Fig. 4.2.2 Installing Backplane
4.2.3 Installing Ai-LB5K battery
Lift the ①Ai-LB5K and hang it on the ②Backplane
The following image gives the indication of how it would be when single set installed.