Instruction Manual

15 UM0039_Ai-LB 5k_EN_V01_0223
Min. clearance between side-by-side Power Box
200 mm
Min. clearance at the bottom
0 mm
Max. slope
+/- 2 degree side-to-side
+/- 5 degree front-to-back
3.5 Unpacking Inspection
When the equipment arrives at the installation site, loading and unloading should be carried out according to the
rules and regulations, to prevent from being exposed to sun and rain.
Before unpacking, the total number of packages shall be indicated according to the shipping list attached to each
package, and the case shall be checked for good condition.
In the process of unpacking, handle with care and protect the surface coating of the object.
Open the package, the installation personnel should read the technical documents, verify the list, according to
the configuration table and packing list, ensure objects are complete and intact, if the internal packing is
damaged, should be examined and recorded in detail.
Packing list is as follows
Item
Serial
number
Specification
Quantity
Figure
Note
Battery
System
Ai-LB5K
490x150x680mm
1
Standard
Wall -
mount
Backplane
1
Standard
Accessor
y Bag
Expansion Bolts:M6x80
2
Hexagonal wrench
1
RJ45 waterproof wiring cover
3
Output
Cable
(CA03-
A
Power Cable
Negative-1: PSR6XAB Black
Plug Cable, 25mm
2
/L1.5m
Positive-2: PSR6XBB Red Plug
Cable,25mm
2
/L1.5m
2
Standard
Communication cable to
Inverter
Black/L1.5m/Double RJ45 Plug
1