Solis_Manual_RHI-1P(5-10)K-HV_USA_V1,1

5. Operation
Monthly Energy
Main interface
information
settings
advanced info.
advanced settings
UP/DOWN
UP/DOWN
UP/DOWN
Pressing the ENTER
key to switch
to the submenu
Pressing the ESC
key calls back
the previous menu
main menu
Figure 5.1 Operation overview
ESC
ESC
ENTER
5.1 Initial Display
When powering up the inverter for the first time, it is required to set the language.
Press "ENT" to select.
Figure 5.2 Set Language
Settings
Set Language
2015-02-23 19 35
English
Y E S =< E N T > N O = < E S C >
4. Installation
Description
The inverter can detect DC power.
No DC power.
The inverter is fully operational.
The inverter has stopped operating.
The inverter is initializing.
Fault condition is detected.
No fault condition detected.
Status
ON
OFF
ON
OFF
OFF
ON
FLASHING
Light
POWER
OPERATION
ALARM
4.8 LED Indicators
There are three LED indicators on the RHI inverter (Red, Green, and Orange)
which indicate the working status of the inverter.
Table 4.1 Status Indicator Lights
FLASHING
Either the grid or solar cannot be detected.
.20. .21.
An external ground connection is provided at the right side of inverter.
Prepare OT terminals: M4. Use proper tooling to crimp the lug to the terminal.
Connect the OT terminal with ground cable to the right side of inverter. The torque is 2N.m.
4.7 External Ground Connection
Figure 4.16 Connect the external grounding conductor