User's Manual
Confidential & Proprietary 19/26 SC-DAS
Figure 3.7 – ROU installation diagram for vertical rack
Type2 : Horizontal installation on the rack
For Horizontal installation, horizontal bracket is needed. Unlike vertical installation, the MRU is
mounted on the right of the installed bracket first and then ARU is installed to the left of MRU
First, install bracket for horizontal installation on the rack
Second, open the front cover of horizontal bracket
Third, mount MRU on the right side of the installed bracket
Fourth, mount ARU on the left side of the installed bracket
Finally, close the front cover of horizontal bracket
Completed installation diagram is as follows