Confidential & Proprietary 16/26 SC-DAS
Figure 3.3 ROU installation diagram side by side
For connecting cables between MRU and ARU easily, the MRU should install on left side of ARU.
Type2 : stacked installation
If space prohibits the MRU and ARU from being mounted side by side, the units can be installed in
a stacked configuration.
Stacking the unit requires a special baracket for stacked installation
First, install the MRU on the wall , then install the bracket for stacked installation on the MRU. Finally
install the ARU on the bracket.
Completed installation diagram is as follows
Figure 3.4 ROU installation procedure for stacked mounting