Installation & Assembly

6
Bending Panels
It's not necessary to cut Solexx when installing over roof peaks or around corners. You can score
the panel using a straight edge and a blunt tipped object such as a Phillips screw driver, (be
careful not to cut the panel) and then fold the panel along the scored line. Solexx paneling can
be scored in either direction, either with the flutes or across the flutes.
Installation
Unrolling
If you plan to install Solexx on a flat surface like an end wall,
unroll the Solexx to let it straighten out. Exposure to warmth
and sunlight will allow you to more fully manipulate the
Solexx if you plan to go around corners or over the top of a
gable.
Installing Solexx on End Walls
Install the Solexx on the end walls first. Your paneling can be
installed vertically or horizontally. Typically, the method is
determined by the greenhouse framing. Keep in mind the extra
width of material is to overlap on 4’ (1.21m) centers, 5’ (1.52m)
centers or 6’ (1.83m) centers. Attach screws every 4-6” (10-
15cm) on all panel edges and where Solexx overlaps. Once the
panels are secured to the end wall, use the framing as a guide for
trimming the paneling.
NOTE: When trimming off portions of Solexx paneling during the
end wall paneling installation, you should leave an extra 1/8” (3mm) of the paneling above the
framing that you are using as a cutting guide. This allows the end wall paneling to “snug” up
against the side walls and roof paneling. Once the paneling is attached and trimmed seal any of
the open ends of the paneling with 100% Silicone caulking.
Vertical Installation: Installing Solexx on the Roof and Sides
Starting with the end bow, adjust the panel so that you have about a 1” (2.5cm) overhang over
the front end wall. The other side of the panel should reach a little over the middle of the 2
nd
bow. We recommend that the overlap joint is opposite the prevailing wind so the wind will blow
across one panel to the next and not right into the overlapped joint. With each successive panel
the desire is to obtain a greater overlap so that in the end there is an overhang over the back
end wall. Attach the screws 4-6” (10-15cm) apart on the end bow only (keeping in mind that you
won’t put screws into the 2
nd
bow until you put the next panel in place). We recommend you
start installing the screws at the peak and work your way down equally on both sides. Attach the
next panel above the first so the edges overlap (like a shingled roof) by 1-1½” (3-4cm). Attach
screws 4-6” (10-15cm) apart along the bow through both layers of paneling. The process is
**Please Note: We
recommend caulking the
open flutes of the end of any
panel that will be at ground
level and letting it dry before
attaching that panel to your
structure.