2. Summary of Installation Steps
This section summarizes the steps needed to properly configure and install the SkyWay
XL100t Radio. As the background and guidelines for much of the radio installation process
are well covered in many in-depth publications and training classes, only those steps that
uniquely relate to the SkyWay product are covered in this User Guide.
NOTE: Per FCC Part 90.377, this product should NOT be installed at a height not
exceeding 8 meters above the roadway bed surface.
A. System Design
• Requirements analysis
• Site Survey
• RF System Design
• IP Network Design
• Physical/Electrical engineering design
B. Unit Preparation
• Unit connection
• Initial Configuration
• Bench testing
C. Site Preparation
• Physical mounting prep
• Electrical prep
• Cable routing
D. Installation
• Unit Mounting
• Spectrum Analysis
• Antenna alignment
E. Verification
• Link status + metrics
• Ping connectivity
• Performance testing