2. Summary of Installation Steps
This section summarizes the steps needed to properly configure and install the SkyWay
XL100t Radio. As the background and guidelines for much of the radio installation process
are well covered in many in-depth publications and training classes, only those steps that
uniquely relate to the SkyWay product are covered in this User Guide.
NOTE: Per FCC Part 90.377, this product should NOT be installed at a height not
exceeding 8 meters above the roadway bed surface.
A. System Design
Requirements analysis
Site Survey
RF System Design
IP Network Design
Physical/Electrical engineering design
B. Unit Preparation
Unit connection
Initial Configuration
Bench testing
C. Site Preparation
Physical mounting prep
Electrical prep
Cable routing
D. Installation
Unit Mounting
Spectrum Analysis
Antenna alignment
E. Verification
Link status + metrics
Ping connectivity
Performance testing