User's Guide
Table Of Contents
- SkyWay Wireless Bridge/Router
- Preface
- Table of Contents
- Chapter 1: Introducing Skyway
- Chapter 2: Getting to Know the SkyWay Bridge/Router
- Chapter 3: Preparing for Installation
- Chapter 4: Installing Skyway
- Chapter 5: Configuring and Managing SkyWay
- Configuring SkyWay
- Setting System Configuration Parameters
- Understanding RF-DLC
- Configuring the Ports
- Bridging
- IP Routing
- Internet Control Message Protocol
- SNMP
- Diagnostics
- File Transfer Utilities
- Security
- Chapter 6: Monitoring SkyWay
- Chapter 7: Troubleshooting Skyway
- Appendix A: Run-time Menu Tree
- Appendix B: BIOS Menu Tree Summary Table
- Appendix C: Interface Specifications and Pinouts
- Appendix D: Detailed Product Specifications
- Appendix E: Supported Protocols
- Appendix F: Error Codes
- Appendix G: SNMP Trap Messages
- Appendix H: Installation Recording Form
- Appendix I: Sources of SNMP Management Software
- Appendix J: Glossary and Basic Concepts
- Appendix K: Skyway Antennas
- Warning:
- Notes:
- 7002301: 6 dBi Omni Directional Antenna
- 7002401: 11 dBi Omni Directional Antenna
- 7002501: 16 dBi Outdoor Flat Panel Directional Antenna
- 7002601: 17 dBi Outdoor Flat Panel Directional Antenna
- 7002701: 22 dBi Outdoor High gain Flat Panel Directional Antenna
- 7002801: 8 dBi Indoor/Outdoor Patch Antenna
- 7002901: 12 dBi 110 Outdoor Sectorial Antenna
- Index

32
Bench Test
Solectek strongly recommends using the Bench Test for testing the SkyWay Bridge/
Router prior to installing it in its permanent location. The test provides a means to
install and configure the equipment to your requirements. It allows you to become
familiar with the equipment’s operation and capabilities in a user-friendly environment.
Installers who bench test all equipment and configurations have a significantly higher
success rate during field installation than those who skip the test.
The following are required for the bench test:
• At least 2 SkyWay units
• SkyWay power cable and AC/DC converter
• Console cable and RS-422 to RD-232 converter
• Test antenna for each SkyWay RF port
• Two terminals or workstations with VT-100 emulation capability (one for each
Skyway), or one workstation with two RS-232 ports to accommodate two
SkyWays (see “Step One: Connecting Components” on page 33).
Minimum Configuration Settings and Factory
Defaults for Bench Test
•RF frequency
RF frequencyRF frequency
RF frequency: Use the most efficient RF frequency for your SkyWay as deter-
mined during the site survey.
• Tap Value
Ta p Va l u eTap Va l u e
Tap Value: During installation, the installer decides on an appropriate tap value
for your SkyWay so that there is no interference with other SkyWay traffic.
•Mode
ModeMode
Mode: Designate one SkyWay as the base station, and the other as the sub
station.