User Guide
I
PV Connection
Grid and Off-grid Connection
Tool Preparation
Quick Installation Guide
*1
X3-Hybrid G4
series inverter
Bracket
Waterproof cover*1
PV terminal
(positive*3 , negative*3 )
Communication line
adapter*3
(Meter/COM/BMS)
RJ45 terminals*5
10AWG Euopean
terminals*12
(Expansion bolt ,Gasket,
Self-tapping bolt)*5
PV pin angle
(positive*3 , negative*3 )
Warranty Card*1
Manual*1
OT terminal*1
M5 inner hexagon bolt*1
CT*1(Optional)
Battery pin angle *1
Hammer drill(Bit Φ10)
Socket wrench set(Hexagon)
(Crosshead M5)Torque screwdriver
Diagonal pliers
Utility knife
Diagonal pliers
Rubber hammer
OT terminals press clamp
(0.5~6mm²)
Tape ruler
Euro terminal crimping tool
Hexagon keys
Spirit level
a)
a ) Use a marker to mark drilling holes of the
bracket on the wall.
b)
d)
d ) The bracket is aligned with the screw uses
the inner hexagonal wrench to screw the
tapping screw until the expansion bolt
"bang" is heard.
65.
00 mm
c) Insert expansion bolt into the hole, use
rubber hammer to knock the expansion
screw bolt into the wall.
e)
f) Use the inner hexagonal wrench to tighten
the inner hexagonal screw on the right side of
the inverter.
e) Hang the buckle on the inverter to the
corresponding position of the backplane.
7.0mm
Step 1. Turn off the DC switch, connect the PV module, prepare a
12AWG PV cable, and find the PV (+) terminal and PV (-) terminal in
the package.
Step 2. Use a wire stripper to strip the 7mm insulation layer of the wire
end.
Wire stripper
Step 4. Tighten the fastening head and into insert the corresponding positive and negative (PV-/PV+) ports of the inverter.
Note: Before inserting the PV terminal, please turn on the switch of the PV module, and use a multimeter to measure the positive and
negative poles of the PV terminal port to prevent reverse connection
Crimping Tool
Negative
Positive
I
Battery Connection
Step 1. Prepare a Grid cable (five-core wire) and an Off-grid cable (four-core wire), and then find the European terminal and waterproof cover in the
accessory bag.
Step 2: First remove the waterproof housing plug, The GRID and Off-grid cables go through the corresponding GRID and Off-grid ports of the
waterproof cover. Remove the 12mm insulation layer at the end of the wire. Insert the European-style terminals respectively, and make sure that
the stripped ends are inserted into the European-style terminal, and use crimping pliers to press tightly. And locked in the Grid and off-Grid ports
respectively. Finally, lock the waterproof cover screw.
High voltage lithium battery
+
-
CAN/RS485
Power line connection
Communication line connection
... ...
Note:
When using SolaX batteries, it is
recommended that the number
of battery control (T-BAT-5.8) is 1
and the number of battery modules
(HV11550) is 2-4; the number of battery control (MC0600) is 1 and the
number of battery control (HV10230) is 2-4 pcs.
8 AWG
15
.
0
mm
Crimping Tool
Step 2. Insert the stripped cables into the DC plug (-) and DC Plug (+) respectively.
Step 3. Press down on the spring by hand, you can hear a click sound, then push the
ends together, and tighten the screw joints.
Step 1. Prepare 8 AWG battery power line, find the DC
plug (+), DC plug (-) in the accessory bag.
Step 4. Insert the battery power lines into the corresponding BAT port (+), (-) of the
inverter.
Note!
After the BMS communication between the battery
and the inverter is finished, the battery will work
normally.
Quick Installation Guide
X3-Hybrid 5.0KW-15.0KW
Packing List
Mounting Steps
Marker
Note: “ ”attachments are not included in the M series inverter attachment package and will be included in the X3-Matebox.
☆
“ ” The inverter in Australia needs to be connected to DRM, which is 1 more communication line adapter than that in other countries.
is the standard accessory in the M-series inverter and the optional accessory in the D-series inverter.
"▲"
☆
X3-Hybrid Series 5.0KW-15.0K W
b) Drill holes at marked spots with depth of 65mm.
PV cable
PV pin
Negative terminal
Positive terminal
Positive PV pin
Negtive PV pin
Step 3. The PV connector is divided into 2 parts, to the plug and the fastening head. Pass the cable through the fastening head and the alignment
plug .Note that the red and black lines correspond to different pairs of plugs. Finally, force the cable into the plug and hear a "click" to indicate that
the connection is complete.
Positive metal
terminal
Negative metal
terminal
Positive terminal
Negative terminal
10AWG Euro Terminal*10
Waterproof cover
10AWG Grid(five-core wire)
Battery connection diagram:
Diagonalpliers
BAT plug (+) BAT plug (-)
Power line
DC plug (-) DC plug (+)
Spring
Cavity
The cable must pass through here
Spring
Spring
Note: BAT port, not PV port!
Note: The positive and negative
wires of the battery are not
allowed to be reversed!
☆
☆
☆
Multimeter
DC Voltage range ≥1100 V DC
Grid Cable and Micro-breaker recommended
Cable (copper)
Micro-Breaker
Model
X3-Hybrid-5.0-D
X3-Hybrid-5.0-M
X3-Hybrid-6.0-D
X3-Hybrid-6.0-M
X3-Hybrid-8.0-D
X3-Hybrid-8.0-M
X3-Hybrid-10.0-D
X3-Hybrid-10.0-M
Off-grid Cable and Micro-breaker recommended
Cable (copper)
Micro-Breaker
Model
X3-Hybrid-5.0-D
X3-Hybrid-5.0-M
X3-Hybrid-6.0-D
X3-Hybrid-6.0-M
X3-Hybrid-8.0-D
X3-Hybrid-8.0-M
X3-Hybrid-10.0-D
X3-Hybrid-10.0-M
X3-Hybrid-12.0-D
X3-Hybrid-12.0-M
X3-Hybrid-12.0-D
X3-Hybrid-12.0-M
Hammer
(Torque :2.5±0.2N·m)
Expansion bolts,
Tapping screws,
c)
nut, Gasket,
Inner hexagonal wrench
(Torque :1.5±0.1 N·m)
f)
PV 2+
Pv1+
PV1-
PV1-
PV 2-
PV1+
Off-gr id
X3-Hybrid-15.0-D
X3-Hybrid-15.0-M
X3-Hybrid-15.0-D
X3-Hybrid-15.0-M
20A
20A
32A
40A
40A 40A
4~6mm²
4~6mm² 5~6mm²
5~6mm²
5~6mm²
4~6mm²
16A
16A
20A
25A
32A 40A
4~6mm²
4~6mm² 4~6mm²
4~6mm²
4~6mm²
4~6mm²
Grid
Off-grid
Crimping Tool
G
r
i
d
O
f
f
-
g
r
i
d
L=12mm
L
L=1
2mm
L
Diagonal pliers
Torque screwdriver
( Torque: 0.7±0.1N·m)
Positive PV pin
Negtive PV pin
Multimeter
DC Voltage
Range ≥1100 V DC
☆
☆
☆
☆
☆
▲
*The PV port wiring of X3-Hybrid G4 M series inverter has been completed. For specic installation details, please refer to the X3-
Matebox Quick Installation Guide, the D series needs to be wired according to the following steps.
Diagram A: N line and PE line separate wiring, D series inverter;
(For most countries)
N
BAT
Battery
N-BAR for loads
N-BAR for off-grid loads
off-grid loads
Loads
X3-Hybrid G4
PV 1
PV 2
E-BAR
RCD
Breaker
Grid
Breaker
Grid
Off-grid
Main Breaker/RCD
Breaker
Breaker
CT
Distribution Box
Diagram B: N line and PE line separate wiring, M series inverter;
(For most countries)
Diagram C: N line and PE line together, D series inverter;
( Applicable to Australia)
N
BAT
Battery
N-BAR for loads
N-BAR for off-grid loads
off-grid loads
Loads
X3-Hybrid G4
PV 1
PV 2
E-BAR
RCD
Breaker
Grid
Breaker
Grid
Off-grid
Main Breaker/RCD
Breaker
Breaker
CT
Distribution Box
N
CT 1
CT 2
CT 3
Diagram D: N line and PE line together, M series inverter;
( Applicable to Australia)
* The Grid and the Off-grid ports of X3-Hybrid G4 M series inverter have been connected, for specific installation details, please refer to the
X3-Matebox Quick Installation Guide .and the D series needs to be wired according to the following steps.
*Battery port connection line of the X3-Hybrid G4 M series
inverter is on the X3-Matebox,for specific installation details,
please refer to the X3-Matebox Quick Installation Guide It is
necessary to wire the D series according to the following steps.
Pocket WiFi 1(Optional)*
N
BAT
Battery
N-BAR for loads
N-BAR for off-grid loads
off-grid loads
Loads
X3-Hybrid G4
PV 1
PV 2
E-BAR
Grid
Grid
Off-grid
Main Breaker/RCD
Breaker
Breaker
CT
CT 1
CT 2
CT 3
X3-Matebox
E-BAR
N
X3-Matebox
N
BAT
Battery
N-BAR for loads
N-BAR for off-grid loads
off-grid loads
Loads
X3-Hybrid G4
PV 1
PV 2
E-BAR
Grid
Grid
Off-grid
Main Breaker/RCD
Breaker
Breaker
CT
Note: The RCD on the gure represents a leakage protection device with a circuit breaker function.
com
※Note: Please press
European terminal into
a 3.3.*3.3mm square.
Hexagon keys
( Torque: 1.2±0.2N·m)
Meter 1*
10AWG Off-grid((four-core wire)
Multifunction terminal crimping
tool (RJ45)
Non-polar
DC MCB
Φ8 Hammer
drill
Click !
Click !
Click !
X3-Hybr id S er ie s
User Manu al
5.0kW - 15.0kW
EN