Installation Guide
Mouli Engineering © 2014 U.S.Patent 8,716,889; Manual Rev 10.0
Label as follows: More labeling than below to meet and exceed install workmanship.
1. Verify Label Installed on Inverter Panel:
THIS SERVICE PANEL IS ENERGIZED FROM Solar Photovoltaic source.
ONLY AUTHORIZED PERSONS WHO ARE FAMILIAR WITH THIS SYSTEM SHOULD
ATTEMPT TO DO SERVICE WORK ON IT.
2. Verify Label Installed near the PV System AC Disconnect
(Model #1003):
OPERATING AC VOLTAGE = __120V______
MAXIMUM AC OUTPUT OPERATING CURRENT = __12A_______
(Model #1004):
OPERATING AC VOLTAGE = __120V______
MAXIMUM AC OUTPUT OPERATING CURRENT = __17A_______
(Model #1005 & 1006):
OPERATING AC VOLTAGE = __120V/240V______
MAXIMUM AC OUTPUT OPERATING CURRENT = __34A_______









