Technical Specifications

Mouli Engineering © 2014 SolarPod
TM
Grid Tied www.mouliengg.com ; 612-424-5176; Manual version 16.0
U.S. Patent No. 8,716,889
Line Diagram: Choose the appropriate line diagram for your application with consultation from your
utility and the installer (master electrician). Panel brand used is only for illustrative purposes for the line
diagram.
The Line
diagram to the
left is when the
utility requires a
production meter
and a
bidirectional
meter installed.
Typically this is
required by the
utility when the
utility gives solar
rebates and also
when the utility
takes the
renewable
energy credits.
The Line
diagram to the
left is when the
customer wishes
to get no credits
from the utility
.