Technical Specifications

Mouli Engineering © 2014 SolarPod
TM
Grid Tied www.mouliengg.com ; 612-424-5176; Manual version 16.0
U.S. Patent No. 8,716,889
Figure 3: Illustration of how the plugs are connected.
The SolarPod
TM
Grid Tied comes with a male receptacle which is the direct connection to the circuit
breaker. The female adapter must be installed at site. The circuit breaker should be a two pole 20A
breaker and should have a Ground Fault Interrupt detection and protection. The wiring should be as given
in the table below. No other circuit should be installed on this breaker circuit.
Power (DC) 960W @ STC (1000 W/m2 @ 25C)
Voltage 240V 208V
AC Power Split phase 3 phase
Wire
L1 & L2-hot;
white-neutral;
Green-ground
L1, L2 & L3-hot;
white-neutral;
Green-ground
Breaker connection 20A 20A
Max # of SolarPod
TM
Grid Tied in series 4 6
The solar installation has to be made up to only 120% of the bus bar rating in the main breaker per NEC
code 705.12.
Disconnect: The SolarPod
TM
Grid Tied comes with a twist lock plug disconnect.
Ground
Neutral
L1
L2
SolarPod
TM
Grid Tied
PLUG
Home Run