Installation manual

28
Safety, Installation, and Operations Manual
© Solaria Corporation All rights reserved. Contents subject to change without notice 8-26-19
Power Unlocked by Design
Step 11: Energize the System
A. If applicable, turn ON the AC disconnect or circuit breaker for the branch circuit.
B. Turn ON the main utility-grid AC circuit breaker. Your system starts producing power after a ve-minute
wait time.
C. Check the LED on the connector side of the microinverter:
LED COLOR INDICATES
Flashing green
Normal operation. AC grid function is normal there is communication with the IQ Envoy.
Flashing orange
The AC grid is normal but there is no communication with the IQ Envoy.
Flashing red
The AC grid is either not present or not within specication.
SOLID RED
There is an active “DC Resistance Low, Power Off Condition.To reset, refer to “DC Resistance
Low – Power Off Condition” on page 32.
The Microinverter LED light