Safety, Installation, and Operations Manual
© Solaria Corporation All rights reserved. Contents subject to change without notice 8-26-19
Power Unlocked by Design
Step 1: Install an AC Junction Box
A. Verify that AC voltage at the site is within range.
SERVICE TYPE AND VOLTAGE: L1-L2
240 V Split-Phase 211 to 264 VAC
208 V Single-Phase 183 to 229 VAC
B. Provide an AC connection back to the electricity network using equipment and practices as required by
local jurisdictions.
Step 2: Position the Enphase Q Cable
A. Plan each cable segment to allow drop connectors on the Enphase Q Cable to align with each AC Module. Allow
extra length for slack, cable turns, and any obstructions.
B. Mark the approximate centers of each PV module on the PV racking.
C. Lay out the cabling loosely on the roof for the AC branch circuit. Make sure the cable is positioned in a way that
allows you to connect it to the microinverter.
D. Cut each segment of cable to meet your planned needs.
WARNING: Do not install the modules in a way that creates continuous tension on the Q Cable.
E. Once the cables are laid out per steps C & D, secure the cable to the rails before installing the modules.
F. Connect the Q Cable.
Position the Q Cable along the edge of the module