Installation manual
15
Safety, Installation, and Operations Manual
© Solaria Corporation All rights reserved. Contents subject to change without notice 8-26-19
Power Unlocked by Design
Parts and Tools Required
In addition to the AC Modules, you will need the following:
Enphase Equipment
y Enphase IQ Envoy communications gateway (ENV-IQ-AM1-240) required to monitor solar production. For
installation information, refer to the Enphase IQ Envoy Installation and Operations Manual.
y Enphase Installer Toolkit Download the Enphase Installer Toolkit mobile app and open it to log in
to your Enlighten account. With this app, you can scan microinverter serial numbers and connect
to the IQ Envoy to track system installation progress. To download, go to enphase.com/toolkit or
scan the QR code at right.
y Enphase Sealing caps (Q-SEAL-10) for any unused drops on the Enphase Q Cable
y Enphase Terminator (Q-TERM-10) typically two needed per branch circuit
y Enphase Disconnect Tool (Q-DISC-10)
y Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F) (optional)
y Enphase Q Cable:
CABLE MODEL CONNECTOR SPACING PV MODULE ORIENTATION CONNECTOR COUNT PER BOX
Q-12-10-240 1.3m Portrait 240
Q-12-17-240 2.0m Landscape 240
Other Items
y Number 2 and 3 Phillips screwdrivers
y Wire cutters, voltmeter
y Torque wrench, sockets, wrenches for mounting hardware
y Crimp tool PV-CZM-18100, -019100, or -22100 for eld wireable connectors
y Compatible cable clips, including:
Wire management options for Q-Cable attached to module frames
STANDARD /PARALLEL TO FRAME 90°/PERPENDICULAR TO FRAME
Nine Fasteners Inc. NFI-1306 Nine Fasteners Inc. NFI-1306-V90
Nine Fasteners Inc. NFI-1306 Burndy/Wiley ACC-F90
Heyco Sunrunner-2
Hellermann Tyton MSC2
* Due to variances in module frame thickness, these wire clips may not work for all modules