Maintenance
From the Commissioning menu, select Maintenance to configure various
system settings, as described below.
Date and Time: Set the internal real-time clock. If connected to the monitoring
platform, the date and time are set automatically and only time zone should be
set.
Reset Counters: Resets the accumulated energy counters that are sent to the
monitoring platform
Factory Reset: Performs a general reset to the default device settings.
Arc Fault Circuit Interrupter (AFCI): Enables or disables production interruption
in case of arc-fault, sets the reconnection mode, and enables or disables manual
AFCIself-test.
Refer to http://www.solaredge.com/sites/default/files/arc_fault_
detection_application_note_na.pdf .
Firmware Upgrade: Perform a software upgrade.
Diagnostics: Displays the Isolation status and power optimizer
status screens. Refer to
https://www.solaredge.com/sites/default/files/application_note_
isolation_fault_troubleshooting.pdf.
Activate Standby Mode: Enables/disables Standby Mode - for
remote commissioning.
Grid Protection: Available in specific countries. Enables viewing and setting grid
protection values.
Board Replacement: Backs up and restores the system parameters, including
energy counters; Used during board replacement according to the instructions
supplied with replacement kits.
Information
From the Commissioning menu, select Information to view and set various system
settings, as described below.