Installation Guide

Perform this step when the modules are exposed to sunlight. If the string length is
changed or a power optimizer is replaced, repeat the pairing process.
1.
From the main menu, select Pairing.
2. Tap Start Pairing.
3.
When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimizers start producing power and the
inverter starts converting AC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high
voltage and the power optimizers no longer output a safe 1V output.
AVERTISSEMENT!
Après avoir mis l'interrupteur ON/OFF/P de l'onduleur monophasé sur ON,
les câbles DC portent une haute tension et les optimiseurs de puissance ne
génèrent plus la tension decurité de 1V.
When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wakeup mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
4. Tap OK to return to the main menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to
Setting Up Communication
on page 68.
1.
Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform
The communication option used to communicate between multiple
SolarEdge devices or other external non-SolarEdge devices, such as
electricity meters or loggers.
2.
Tap the Server red arrow to set the communication method to be used for
communication between devices and the SolarEdge monitoring platform. The
default is LAN.
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5
54 Step 2: Commissioning and Configuring the Installation