Installation Guide

ensure the power optimizers are not be exposed to temperatures outside their
specifications.
NOTE
The images contained herein are for illustrative purposes only and may vary
depending on product models.
Step 1: Mounting and Grounding the Power
Optimizers
For each of the power optimizers
(1)
:
1. Determine the power optimizer mounting location and use the power
optimizer mounting brackets to attach the power optimizer to the
support structure (See
Figure 5
). It is recommended to mount the
power optimizer in a location protected from direct sunlight. For
frame-mounted power optimizers follow the instructions supplied
with the optimizers, or refer to https://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf.
2.
If required, mark the mounting hole locations and drill the hole.
CAUTION!
Drilling vibrations may damage the power optimizer and will void the
warranty. Use a torque wrench or an electric drill with adjustable clutch that
meets the mounting torque requirements.
Do not
use impact drivers for
mounting the power optimizer.
Do not
drill through the power optimizer or through the mounting holes.
ATTENTION!
Les vibrations résultant du perçage peuvent endommager l’optimiseur de
puissance et annulera la garantie. Utilisez une cdynamométrique ou une
perceuse électrique avec embrayage adaptable compatible avec les
moments indiqués. Ne pas utiliser des tournevis à percussion pour fixer
l’optimiseur. Ne pas percer à travers l’optimiseur de puissance ou ses trous
de fixation.
3.
Attach each power optimizer to the rack using M6 (1/4'') stainless steel bolts, nuts
and washers or other appropriate mounting hardware. Apply torque of 9-10 N*m /
(1)
Not applicable to smart modules.
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5
22 Step 1: Mounting and Grounding the Power Optimizers
6.5-7 lb*ft.