Installation Manual

Backup Power with Smart Energy Management - System Configurations
8
Basic Configuration
This configuration is based on one of each of the StorEdge components and is suitable for most residential systems.
Figure 7: Backup Power with Smart Energy Management - Basic configuration
To configure the meter and the battery:
1 Terminate the battery connected on the RS485 bus:
2 Set the battery’s dip switches to ID 24: Move all dip switches to position 0 (to the right):
3 Make sure the wiring is connected according to the diagram above.
4 Upgrade the inverter firmware using the card supplied with the StorEdge Inverter. This will also configure the meter and the
battery.