Installation Manual
Smart Energy Management Only - System Configurations
31
AC Coupling using a non-SolarEdge Inverter
For sites with an already installed PV system with a non-SolarEdge inverter, the SolarEdge inverter can be AC-coupled to the
existing inverter, i.e. the StorEdge inverter used to manage the battery is connected to the AC output of the existing inverter.
NOTE
The meter is used for Smart Energy Management and does not measure the non-SolarEdge inverter production. The
production and self-consumption information in the moniotring portal does not take into account this production.
Figure 27: Smart Energy Management only - AC Coupling using a non-SolarEdge Inverter
AC Coupling without a PV System
For charge/discharge profile programming a StorEdge system may be installed without a PV system. In this case, the battery is
charged from the AC grid only.
NOTE
For maximizing self-consumption a PV system is required.
Figure 28: Smart Energy Management only - AC coupling without a PV system