Installation Manual

Backup Power with Smart Energy Management - System Configurations
10
2 To set a minimum battery charge level, so that the battery will always have energy stored in case backup power is needed,
do the following:
Select Power Control Energy Manager Storage Control. The following is displayed:
Select Backup RSVD and set the required level as percentage of the battery capacity. Set %PV according to
user requirement.
3 After configuring the meter, the battery and backup power, proceed with Smart Energy Management application
configuration for maximize self-consumption or for charge/discharge profile programming.
To set up Maximize Self-consumption:
1 Select Power Control Energy Manager Energy Ctrl Max Self-Consume.
To set up Charge/Discharge Profile Programming:
1 Select Power Control Energy Manager Energy Ctrl Time of Use.
2 Profile loading can be done remotely from the monitoring portal or locally from the inverter using a micro-SD card. Refer to
Appendix A Creating a Charge/Discharge Profile on page 32 for information on creating a charge/discharge profile file.
3 For remote loading:
In the monitoring portal, click the Admin icon and select the Energy Manager tab.
Select Set profile from server and from the drop down list select a profile. If no available profile is suitable,
contact SolarEdge support.
Press Save and in the pop-up window select Yes to apply the profile. The profile will be loaded to the
inverter upon next connection (normally within 5 minutes; if communications are down it will be uploaded
when communications are restored)
NOTE
If the system is connected to the server with a GSM modem and with a SolarEdge data plan, loading can take place up
to 4 hours after applying from portal.
Figure 8: Profile programming screen
4 For local loading using a micro-SD card:
Select Energy Manager Set Calendar.
Insert the card with the profile file to the slot on the inverter communication board.
Select Load SD.
5 If the charge/discharge profile includes battery charge from the AC grid, this must be enabled, either from the inverter or as
part of the profile file. Refer to the Appendix A Creating a Charge/Discharge Profile for information on enabling this as part
of the file.
NOTE
Use battery charge from AC grid only if permitted by local regulations.
To enable from the inverter:
1 Select Energy Manager Storage Control.