Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Chapter 9: Setting Up Communication to the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output circuit).
inverter information
Information of any other connected devices.
This chapter describes setting up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless), or
through a cellular connection.
Multiple inverters for a master/slave configuration.
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF
switch on the StorEdge Connection Unit is turned OFF, and the AC is turned
OFF.
When configuring the communication parameters, make sure that the ON/OFF
switch on the StorEdge Connection Unit is OFF, and the AC is turned ON.
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que
l'interrupteur MARCHE/ARRÊT à la base de l'onduleur soit en position ARRÊT,
et le CA est en position ARRÊT. Lors de la configuration des paramètres de
communication, assurez-vous que l'interrupteur MARCHE/ARRÊT soit en
position ARRÊT, et le CA est en position MARCHE.
StorEdge Solution with Backup MAN-01-00262-1.5
96 Chapter 9: Setting Up Communication to the Monitoring Platform