Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Charge/ Discharge Profile Programming Status
This screen is displayed only if Charge/ Discharge Profile Programming [Time-of-Use
(TOU)] is configured, and shows information about the TOUsettings for the site.
N a m e : x x x x
L a s t S y n c : < D a t e >
S o u r c e : < R e m o t e >
S e t U n t i l : < d a t e >
Name: The TOUprofile file name
Last Sync: Date when the time-of-use profile was loaded from the monitoring
platform
Source: the source from which the TOUprofile was uploaded:
Remote - Profile uploaded from the SolarEdge monitoring platform
Local - Profile uploaded from an SDcard
Set Until: The date until the current profiles applicable
Chapter 8: User Interface 95
StorEdge Solution with Backup MAN-01-00262-1.5