Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

B S N : X X X X X X X X X I D : 1 5
S O E : 8 9 % P W R : 2 W
T o t a l : < x > W h
S t a t e : C h a r g i n g
BSN: Battery serial number
ID: Battery identification - should be 24 as set up above
SOE: State of Energy - the battery capacity percentage (calculated as Available
Energy\Max. Energy)
PWR: The charging or discharging power (in Watts)according to the battery state
(see below)
Total: The total discharged energy in Watt/hour
State: The battery status: Charging/ Discharging, Idle, Init (pre-heating) or Fault
<error code>.
StorEdge Solution with Backup MAN-01-00262-1.5
94 Status Screens - Operational Mode