Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Contents
Disclaimers 1
Important Notice 1
FCC Compliance 2
Revision History 3
HANDLING AND SAFETY INSTRUCTIONS 9
Safety Symbols Information 9
IMPORTANTINVERTER SAFETYINSTRUCTIONS 10
Chapter 1: Overview 15
The StorEdge Solution Components 15
Additional Reference 17
Installation Workflow 17
Installation Equipment List 19
Inverter Transport and Storage 19
Chapter 2: Installing the Power Optimizers 20
Safety 20
Package Contents 23
Installation Guidelines 23
Step 1: Mounting and Grounding the Power Optimizers 25
Step 2: Connecting a PV Module to a Power Optimizer 28
Step 3: Connecting Power Optimizers in Strings 29
Step 4: Verifying Proper Power Optimizer Connection 29
Chapter 3: Installing the Inverter 31
Inverter Package Contents 31
Identifying the Inverter 32
Inverter Interfaces 32
Mounting the Inverter 35
Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for
Backup) 40
Mounting the Auto-transformer 41
Installing the Backed-up Loads Panel 41
Chapter 5: Meter Installation 43
Chapter 6: Commissioning the Installation 45
Removing the Inverter Cover 45
Step 1: Activating the System 46
Step 2: Pairing Power Optimizers to the Inverter 50
Step 3: Verifying Proper Activation 52
Step 4: Reporting and Monitoring Installation Data 53
Chapter 7: StorEdge Inverter Connections 56
StorEdge Solution with Backup MAN-01-00262-1.5
6