Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Figure 28: StorEdge Connection Unit DIPīswitches
Connecting Communication to the Meter
If a meter was installed, connect it to the StorEdge Connection Unit as described in the
following table. For detailed information refer to the installation guide supplied with
the meter.
Recommended cable type
(min-max AWG)
StorEdge Connection
Unit
Meter connection
RS485 24 AWG (16-24
AWG), shielded twisted
pair, 600V insulated
Ext. Devices 7-pin
terminal block: B, A, G
RS485 4-pin terminal block: B, A, G
Connect as illustrated below:
StorEdge Solution with Backup MAN-01-00262-1.5
66 īīConnecting Communication to the Meter