Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

The following figure shows the connections in the StorEdge Connection Unit:
Figure 21: The StorEdge Connection Unit connections
Installing the 9VBattery and Fuses
A 9Vbattery is supplied with the inverter accessories. Install the 9V battery in the holder
on the top board of the StorEdge Connection Unit and connect it to the battery pad.
Figure 22: The battery holder
Two 25A fuses are supplied with the high power inverters. Install the fuses in the
holders on the top board of the StorEdge Connection Unit .
Chapter 7: StorEdge Inverter Connections 57
StorEdge Solution with Backup MAN-01-00262-1.5