Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Chapter 7: StorEdge Inverter Connections
Connect the system components to the StorEdge Connection Unit as described in this
chapter.
NOTE
The conduits, hubs and fittings must be suited for field wiring systems.
The hubs and other fittings must comply with UL514B.
Use the conduit and wiring appropriate for the installation location per the
NEC.
Outdoor installations must use components that are rated NEMA 3R or
higher.
StorEdge Solution with Backup MAN-01-00262-1.5
56 Chapter 7: StorEdge Inverter Connections