Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

StorEdge Connection Unit
Figure 10: StorEdge Connection Unit
The StorEdge Connection Unit includes:
DC safety switch: disconnects both the positive and negative conductors of the PV
and the positive and negative conductors of the battery.
Openings for conduit entry: Four openings are ready to use and have sealing
covers. Two openings are closed with drill guides. If required, open the drill guides
as described in
Opening Conduit Drill Guides
on page 136.
Internal AC Breaker and Bypass Switch
The following components are part of the StorEdge Connection Unit and may be
accessed for troubleshooting or maintenance by removing the internal cover.
StorEdge Solution with Backup MAN-01-00262-1.5
34 Inverter Interfaces