Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Chapter 2: Installing the Power Optimizers
Safety
The following notes and warnings apply when installing the power optimizers. Some of
the following may not be applicable to smart modules:
WARNING!
The metallic enclosure of the power optimizer must be grounded in accordance
with the product's listing and local and national codes.
AVERTISSEMENT!
L'enceinte métallique de l’optimiseur de puissance doit être mise à la terre en
accord avec les régulations locales et nationales.
StorEdge Solution with Backup MAN-01-00262-1.5
20 Chapter 2: Installing the Power Optimizers