Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Step 6 - Connecting all components to the inverter - connect the auto transformer and
loads (AC), PV strings (DC), and meter. Refer to
StorEdge Inverter Connections
on page
56. .
Step 7 - Commissioning the inverter - Activate the system and pair the power
optimizers. Refer to
Commissioning the Installation
on page 45.
Step 8 - Connecting to the monitoring platform. Refer to
Setting Up Communication to
the Monitoring Platform
on page 96.
Step 9 - System Configuration - Configuring the RS485 bus and StorEdge applications.
Refer to
System Configuration
on page 109.
The following flowchart appears throughout this Installation Guide to assist with the
installation steps:
For additional information, refer to
https://www.solaredge.com/sites/default/files/storedge_wiring_quick_guide_and_
on_site_checklist_na.pdf.
StorEdge Solution with Backup MAN-01-00262-1.5
18 Installation Workflow