Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Appendix F: Powering the LG Chem Battery Off
and On
The LGChem battery must be powered off and on at different stages of the inverter
installation.
LGChem batteries are available with either of the following two types of powering
mechanism design:
With the disconnect switch (requires Firmware version 3.24xx or later):
With the auxiliary power switch:
To power off the battery:
1. Turn off the circuit breaker.
2. Turn off the disconnect/auxiliary power switch.
To power the battery back on:
1. Turn on the disconnect/auxiliary power switch.
2. Turn on the circuit breaker.
Appendix F: Powering the LG Chem Battery Off and On 147