Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

Figure 50: External shutdown switch connection
3.
Connect the external shutdown switch wires to the E1 and E2terminals.
4. Close the StorEdge Connection Unit cover.
5. Turn on the external shutdown switch.
6.
Turn on AC.
7.
Enable remote shutdown:
a. Enter Setup mode.
b. Select Maintenance è Power Control è Remote Shutdown è Enable.
To check the external shutdown switch operation:
1. Turn on the inverter
Remove the StorEdge Connection Unit covers:
on page 38
2.
Turn off the inverter's ACcircuit breaker on the main distribution panel.
3. Make sure the inverter switches to Backup mode.
4.
Turn off the external shutdown switch.
5. Check that the DCvoltage (displayed on the inverter's LCD)decreases to 30V within
30 seconds.
6. Turn on the external shutdown switch.
StorEdge Solution with Backup MAN-01-00262-1.5
144 Appendix D: External Rapid Shutdown