Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT INVERTER SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup)
- Chapter 5: Meter Installation
- Chapter 6: Commissioning the Installation
- Chapter 7: StorEdge Inverter Connections
- Chapter 8: User Interface
- Chapter 9: Setting Up Communication to the Monitoring Platform
- Chapter 10: System Configuration
- Appendix A: Troubleshooting
- Appendix B: Opening Conduit Drill Guides
- Appendix C: Replacing and Adding System Components
- Appendix D: External Rapid Shutdown
- Appendix E: Mechanical Specifications
- Appendix F: Powering the LG Chem Battery Off and On
- StorEdge Single Phase Inverter with Connection Unit for High Power Technical ...

B a c k u p R s v d < 2 0 % >
G r i d C h a r g e < E n >
A C C h a r g e L i < N o n e >
c.
Select Grid Charge and one of the following options:
Enable: Charge from both PV and grid to reach backup reserved value
Disable: Charge from PV only to reach backup reserved value
Setting Charge/ Discharge Profile + Backup Power
In this mode, you first set the system to charge/ discharge profile (for time-of-use
arbitrage) and the level of charging the battery from AC. Then, you set up the level of
stored energy to be reserved for backup.
To set up Charge/ Discharge Profile (TOU) + Backup Power:
1. Access the Energy Ctrl. menu as described above.
2.
Select Time of Use.The Energy Manager screen changes to display the following:
L i m i t C o n t r o l < D i s >
E n e r g y C t r l < T O U >
S e t C a l e n d a r
S t o r a g e C o n t r o l
3.
From the Energy Manager menu select Set Calendar. The following screen is
displayed, showing options for calendar setting:
S e r v e r S y n c < D i s >
L o a d S D < N / A >
4.
Do one of the following:
To load a time-of-use table from the monitoring platform, refer to
https://www.solaredge.us/sites/default/files/storedge_charge_discharge_
profile_programming.pdf .
To load a time-of-use table from the SolarEdge SDcard (contact SolarEdge to
obtain it), insert the card to the slot labeled "Card" on the communication board
and select Load SD. From the displayed list select the directory and the table
(filename).
5.
To set up the level of charging from AC, do the following:
a.
Select Energy Manager è Storage Control. The following is displayed:
B a c k u p R s v d < N / A >
A C C h a r g e L i < N o n e >
StorEdge Solution with Backup MAN-01-00262-1.5
118 Configuring StorEdge Applications