Install Manual

Table Of Contents
7. Ensureproperconduitsealing;inspecttheentireconduitrunandusestandardconduitsealantsto
avoidwaterpenetration.
Adding, Removing, or Replacing Power Optimizers
1. TurnOFFtheinverterON/OFF/Pswitch,andwaituntilthegreenLEDisblinking,indicatingthatthe
DCvoltageissafe(<50V),orwaitfiveminutesbeforecontinuingtothenextstep.
2. DisconnecttheACtotheinverterbyturningOFFthecircuitbreakersonthedistributionpanel.
3. TurnOFFtheSafetySwitch.
4. Disconnectandconnectthenecessarypoweroptimizers.
5. PerformpairingandotherproceduresdescribedinActivating,CommissioningandConfiguringthe
SystemUsingtheInverterSetApponpage41onallinverterstowhichpoweroptimizerswereadded
orfromwhichpoweroptimizerswereremoved.
6. Inthemonitoringplatform,usetheReplacebuttoninthelogical layouttab(insite
Admin).Replacetheserialnumberoftheremovedpoweroptimizerwiththeserial
numberofthenewlyinstalledpoweroptimizer.Referto
https://www.solaredge.com/sites/default/files/se-monitoring-portal-site-admin.pdf
Appendix D: Replacing and Adding System Components
-Three Phase System Installation Guide MAN-01-00527-1.1
71