Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
Site Status
TheSitestatusscreenshowstheaccumulatedstatusofallinvertersconnectedtoamasterinverterina
chain(bus)andthemasterinverterstatus.
Status
Site
Production
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
USA2
Switch Off. Production disabled ›
Commissioning›
l Sitestatus:
o
Production:TheACoutputpower
o
Limit:Limitationsetting(ExportorProduction)
o
Inverters:Numberofconnectedinvertersinthecluster,includingthemaster.
Communication Status
Thisscreendisplaysthestatusofconnectionoption(s):LAN,RS485,cellularorZigBeePlug-in.
Communication
LAN
Connected
RS485-1
SE Slave
NC
RS485-2
Modbus
2 of 2
Cellular
N/A
ZigBee
NC
Foreachcommunicationoption,oneofthefollowingstatusesisdisplayed:
l Connected:Theinverterestablishedasuccessfulconnectionandcommunicationwiththespecified
serverport