Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
Step 2: Commissioning and Configuring the
Installation
ThissectiondescribeshowtousetheSetAppmenusforcommissioningandconfiguringtheinverter
settings.
Menusmayvaryinyourapplicationdependingonyoursystemtype.
To access the Commissioning screen:
Dooneofthefollowing:
l Duringfirsttimeinstallation:UponActivationcompletion,intheSetApp,tapStart Commissioning.
ThemainCommissioningmenuscreenisdisplayed.
l Iftheinverterhasalreadybeenactivatedandcommissioned:
a. IfnotalreadyON-turnONACtotheinverterbyturningONthecircuitbreakeronthemain
distributionpanel.
b.
OpenSetAppandfollowtheinstructionsonthescreen(scantheinverterbar-code;movethe
ON/OFF/PswitchtoPposition(forlessthan5sec)andrelease).
ThemobiledevicecreatesaWi-Ficonnectionwiththeinverteranddisplaysthemain
Commissioningscreen.
Inthemainmenus,tapthemenuredarrows(›)toperformthesystemcommissioningorconfiguration
task.TaptheBackarrow(‹)toreturntothepreviousmenu.
Thenextsectionsprovidemoreinformationaboutconfigurationoptions(inadditiontoCountry and
LanguageandPairing,describedinStep2:CommissioningandConfiguringtheInstallationonpage42).
Setting Country and Language
1.
FromtheCommissioningscreenselectCountry and Language.
2.
FromtheCountrydrop-downlist,selecttherequiredcountrysetting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
AVERTISSEMENT!
L'onduleur doit être configuré pour le pays approprié afin d'assurer un fonctionnement convenable
avec le réseau de ce pays.
3. FromtheLanguagedrop-downlist,selectthelanguage.
4. TapSet Language.
Pairing
1.
Fromthemainmenu,selectPairing.
2. TapStart Pairing.
-Three Phase System Installation Guide MAN-01-00527-1.1
42
Step 2: Commissioning and Configuring the Installation