Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
To connect the AC grid to the Safety Switch – 9kW, 10kW, 20kW:
1. Strip05⁄16''(8mm)oftheACwireinsulation.
2.
InserttheACconduitintotheAC-sidedrillguidethatwasopened.
NOTE
Connect the equipment grounding before connecting the AC wires to the AC.
Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA au bornier CA.
3.
Connectthewiresasfollows:
a. Useastandardflat-bladescrewdrivertoconnectthewirestothespring-clampterminals(See
Figure24).
b. Thescrewdriverbladeshouldfitfreelyintheterminalopening.Toolargeabladecancrackthe
plastichousing.
c. Insertthescrewdriver,pressthereleasemechanismandopentheclamp.
d.
Insertthewireintotheroundopeningandremovethescrewdriver–thewireisautomatically
clamped.
Figure 24: AC Spring-clamp terminal – 9kW, 10kW, 20kW inverter
-Three Phase System Installation Guide MAN-01-00527-1.1
38
Connecting the AC Grid to the Safety Switch