Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
Chapter 4: Connecting the AC and the Strings
to the Safety Switch
TheSafetySwitchdisconnectsallungroundedDCconductorsincompliancewiththeNationalElectric
Code(NEC;SpecificallyNEC690.35,whichaddressesungroundedPVarrays).TheSafetySwitchisratedto
themaximumoperatingconditionsoftheinverter.
Invertersofdifferentmodelsareequippedwithdifferentsizes/typesofterminalblocks.
ThefollowingfiguresillustrateseveraloftheavailableSafetySwitches.
Figure 19: Inside the Safety Switch for three phase inverters
(9kW, 10kW, 20kW)
Figure 20: Inside the Safety Switch for three phase inverters
(14.4kW & 33.3kW)
Chapter 4: Connecting the AC and the Strings to the Safety Switch
-Three Phase System Installation Guide MAN-01-00527-1.1