Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
Figure 11: LEDs
ThefollowingtabledescribessystemperformanceinformationbyLEDcolorandON/OFF/Pswitch
position.
Indication
ON/ OFF/ P
switch
position
LED color
Comment
Red Green Blue
Power optimizers not
paired
ON (1)
OFF Blinking
o
S_OK: ON
o
No S_OK: OFF
S_OK: ON
communication
with the
monitoring
platform is
established.
Pairing Blinking Blinking Blinking
Wake-up/ Grid
Monitoring
OFF Blinking Blinking
System Producing OFF ON
o
S_OK: ON
o
No S_OK: OFF
Night mode
(no production)
OFF Flickering
o
S_OK: ON
o
No S_OK: OFF
Inverter is OFF
(Safe DC)
OFF (0)
OFF Blinking
o
S_OK: ON
o
No S_OK: OFF
Inverter is OFF
(DC not safe)
Blinking Blinking
o
S_OK: ON
o
No S_OK: OFF
Inverter
configuration
or reboot
ON / P ON ON ON
Inverter firmware
upgrade
ON / P Alternating Alternating Alternating
The upgrade
process can
take up to 5
minutes
Error Any ON
ON/ OFF/
Blinking/
Flickering
ON/ OFF /
Blinking
Refer to Errors
and
Troubleshooting
on page 61
ThefollowingtabledescribesprodcutionpercentageofACinformationbyLEDcolorandON/OFF/P
switchposition.
Chapter 3: Installing the Inverter
-Three Phase System Installation Guide MAN-01-00527-1.1
25