Install Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Technical Specifications - Three Phase Inverters (North America)
Step 3: Connecting Power Optimizers in Strings
Youcanconstructparallelstringsofunequallength,thatis,thenumberofpower
optimizersineachstringdoesnothavetobethesame.Theminimumandmaximum
stringlengthsarespecifiedinthepoweroptimizerdatasheets.RefertotheDesignerfor
stringlengthverification.
IMPORTANT SAFETY FEATURE
ForacompliantPVRapidShutdownSystem(PVRSS)installation,usenomorethan30
optimizersperstring.
1. ConnecttheMinus(-)outputconnectorofthestring’sfirstpoweroptimizertothePlus(+)output
connectorofthestring’ssecondpoweroptimizer.
2.
Connecttherestofthepoweroptimizersinthestringinthesamemanner.
WARNING!
If using a dual-input power optimizer and some inputs are not used, seal the unused input
connectors with the supplied pair of seals.
AVERTISSEMENT!
Si un optimiseur à double entrées est utilisé et que certaines entrées ne sont pas connectées,
fermez ces entrées avec la paire de couvercles fournie.
Figure 8: Power optimizers connected in series
3.
Ifyouintendtomonitortheinstallation,usingthemonitoringplatform,recordthephysicallocation
ofeachpoweroptimizer,asdescribedinCreatingLogicalandPhysicalLayoutusingInstallation
Informationonpage49.
Chapter 2: Installing the Power Optimisers
-Three Phase System Installation Guide MAN-01-00527-1.1
21