SE9K SetApp Enabled Manual
indicates a lagging CosPhi.
For more information, refer to the
Power Control Application
Note
, available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/application_note_power_
control_configuration.pdf.
Limit: The inverter maximum output power
Country: The selected country and grid setting
Voltage (Vdc): The DC input voltage
Temp (°C or °F): The inverter heat sink temperature
Site Status
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
Status
Site
Production
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
USA2
Switch Off. Production disabled›
Commissioning ›
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 59
Three
Phase
System
Installation
Guide
MAN-01-00527-1.2