To connect the AC grid to the Safety Switch – 9kW, 10kW, 20kW:
1. Strip 0516'' (8mm) of the AC wire insulation.
2.
Insert the AC conduit into the AC-side drill guide that was opened.
NOTE
Connect the equipment grounding before connecting the AC wires to the
AC.
Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA
au bornier CA.
3.
Connect the wires as follows:
1. Use a standard flat-blade screwdriver to connect the wires to the spring-clamp
terminals (See
Figure 24
).
2. The screwdriver blade should fit freely in the terminal opening. Too large a blade
can crack the plastic housing.
3. Insert the screwdriver, press the release mechanism and open the clamp.
4.
Insert the wire into the round opening and remove the screwdriver the wire is
automatically clamped.
Figure 24: AC Spring-clamp terminal 9kW, 10kW, 20kW inverter