SE9K SetApp Enabled Manual

When installing modules in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) modules, ventilation measures may be needed to
ensure the power optimizers are not be exposed to temperatures outside their
specifications.
NOTE
The images contained herein are for illustrative purposes only and may vary
depending on product models.
Chapter 2: Installing the Power Optimizers 21
Three
Phase
System
Installation
Guide
MAN-01-00527-1.2