Installation Guide
Color Description
Green
ON - Ready to charge
Blinking – Scheduled charge is configured
Blue
ON - the EVCharger is plugged in but not charging
Blinking - Charging
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1. Move the Connection Unit ON/OFF switch and the inverter ON/OFF/P switch to
OFF.
2.
Loosen the screws on the front cover of the Safety Switch , as shown below:
Figure 13: Opening the Safety Switch cover
3. Remove the Safety Switch cover.
4.
Open the required AC and DC conduit drill guides according to the conduits used in
the installation: The drill guides are located at the bottom and sides of the
enclosure, each with two sizes: ¾'' and 1''. Open the required drill guides, taking
care not to interfere with any of the internal components. It is recommended to use
a Unibit drill.
EV Charging Single Phase Inverter Guide MAN-01-00404-1.2
32 Opening Conduit Drill Guides