Installation Guide

Frame-mounted power optimizers are mounted directly on the
module frame , regardless of racking system (rail-less or with rails).
For installation of frame-mounted power optimizers, refer to
http://www.solaredge.com/sites/default/files/installing_frame_mounted_
power_optimizers.pdf.
The power optimizer can be placed in any orientation.
If connecting more modules than optimizer inputs in parallel, use a branch
cable. Some commercial power optimizer models have a dual input.
Position the power optimizer close enough to its module so that their cables
can be connected.
Make sure to use power optimizers that have the required output conductor
length:
Do not
use extension cables between a module and a power optimizer,
between two modules connected to the same optimizer, or between two
optimizers other than in the cases specified below.
You can use extension cables between power optimizers only from row
to row, around obstacles within a row, and from the end of the string to
the inverter, as long as the maximum distance is not exceeded.
NOTE
Use at least 11 AWG/ 4 mm² DC cables.
The total cable length of the string (excluding power
optimizers’ cables) should not exceed 1000ft./300 m
from DC+ to DC- of the inverter.
Completely shaded modules may cause their power optimizers to temporarily
shut down. This will not affect the performance of the other power optimizers in
the string, as long as the minimum number of unshaded power optimizers
connected in a string of modules is met. If under typical conditions fewer than
the minimum optimizers are connected to unshaded modules, add more
optimizers to the string.
Equipment grounding tightening torques: 4-6 AWG: 45 lb-in, 8 AWG: 40 lb-in,
10-14 AWG: 35 lb-in.
To allow for heat dissipation, maintain a 2.5 cm / 1" clearance distance between
the power optimizer and other surfaces, on all sides except the mounting
bracket side.