Installation Guide
6. Recordpoweroptimizerserialnumbersandlocations,asdescribedinReportingandMonitoring
InstallationDataonpage35.
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Imagesareforillustrationpurposesonly.Refertothelabelontheproducttoidentifytheplusand
minusinputandoutputconnectors.
Foreachofthepoweroptimizers:
l ConnectthePlus(+)outputconnectorofthemoduletothePlus(+)inputconnectorofthepower
optimizer.
l ConnecttheMinus(-)outputconnectorofthemoduletotheMinus(-)inputconnectorofthe
poweroptimizer.
Figure 8: Power optimizer connectors
Step 3: Connecting Power Optimizers in Strings
Youcanconstructparallelstringsofunequallength,thatis,thenumberofpower
optimizersineachstringdoesnothavetobethesame.Theminimumandmaximum
stringlengthsarespecifiedinthepoweroptimizerdatasheets.RefertotheDesignerfor
stringlengthverification.
NOTE
l Useatleast11AWG/4mm²DCcables.
l Thetotalcablelengthofthestring(excludingpoweroptimizers’cables)shouldnotexceed
1000ft./300mfromDC+toDC-oftheinverter.
1. ConnecttheMinus(-)outputconnectorofthestring’sfirstpoweroptimizertothePlus(+)output
connectorofthestring’ssecondpoweroptimizer.
Chapter 2: Installing the Power Optimizers
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
21